NorthStar Transload Facility

Territorial-Landworks, Inc. provided boundary retracement surveys, 13 ALTA/ASCM land title surveys, easement exhibits, topography survey, & construction surveying.

The NorthStar project included development of a 430-acre transload facility designed to accommodate pipeline and truck/rail import/export of oil, fracking sand, and other materials in support of the Bakken oil field production. The site is located in McKenzie County near Fairview Montana.

Territorial-Landworks, Inc. worked with the owner from the conceptual phase to master plan the 430-acre state of the art transload facility. TLI assisted the team with all entitlements, permitting, and design approvals through the Army Corps of Engineers, McKenzie County Planning and Road Departments, Yellowstone Township Zoning and Subdivision Approvals, NDOT, North Dakota Department of Health, Lower Yellowstone Irrigation District, and BNSF Railroad for all development and building permits.

TLI provided boundary retracement surveys, 13 ALTA/ASCM land title surveys, easement exhibits, topography survey, and construction surveying.